China Coal Tendering Co., Ltd. entrusted by the purchaser, invites sealed bids from eligible suppliers home and abroad for the supply of the following goods and/or service by way of International Competitive Bidding. The tender notice was released on www.chinabidding.com on2025-01-031、Bidding ConditionsOverview:China Coal Yulin Coal Deep Processing Base Project of ChinaCoal Shaanxi Energy & Chemical Group Co., Ltd. LDPE/EVA Extruder and Pelleting System Package Unit , the procurement scope includes two extrusion granulation systems (main extruder and additive extruder). The main extruder includes: 1 main extruder and its associated main motor and variable frequency drive system associated transformer, main extruder tail gas discharge system, granulator and its associated motor and variable frequency drive system, die face cutter and hot oil system,-up valve, screen changer system, gearbox lubrication system, particle water system, hydraulic oil system, three-way diverter valve and slide valve, hot water system, particle drying and grading system, exhaust fan system. The additive extruder system includes: 1 additive extruder, gearbox and its associated motor and variable frequency drive and associated transformer (if any), lubrication system, piping and accessories from the additive extruder to the main extruder system, barrel heating system. The extr granulation system also includes internal piping valve station, PLC control system, ESD interlock system and on-site control panel, condition monitoring, cable tray and related and instrumentation equipment, spare parts, technical service, anchor bolts, supports, initial fill of lubricating oil, special tools, etc.Source of Funds:Had Been FundedDescription of The Prepared Bidding Conditions:Had Been Prepared2、Bidding ContentBidding No:0756-244CCTC50043Project Name:China Coal Yulin Coal Deep Processing Base Project of ChinaCoal Shaanxi Energy & Chemical Group Co., Ltd. LDPE/EVA Extruder and Pelleting System Package Unit ProcurementPlace of Implementation:Yulin, Shaanxi, ChinaList of Products:
NO.
|
Product Name
|
Quantity
|
Main Technical Data
|
Remarks
|
1
|
EX 1701 Main Extruder
|
1
|
See technical specification
|
Overseas delivery: CIF for 104 weeks, domestic port; Domestic delivery: DDP, 104 weeks to the use site for, Vehicle-delivery.
|
2
|
EX 1701-M1 Main Extruder Motor
|
1
|
See technical specification
|
Overseas delivery: CIF for 104 weeks, domestic port; Domestic delivery: DDP, 104 weeks to the use site for, Vehicle-delivery.
|
3
|
variable speed (VSDS)
|
1
|
See technical specification
|
Overseas delivery: CIF for 104 weeks, domestic port; Domestic delivery: DDP, 104 weeks to the use site for, Vehicle-delivery.
|
4
|
(transformer for VSDS) and harmonic filter (1set)
|
1
|
See technical specification
|
Overseas delivery: CIF for 104 weeks, domestic port; Domestic delivery: DDP, 104 weeks to the use site for, Vehicle-delivery.
|
5
|
G 1704-Main Extruder Gear Box
|
1
|
See technical specification
|
Overseas delivery: CIF for 104 weeks, domestic port; Domestic delivery: DDP, 104 weeks to the use site for, Vehicle-delivery.
|
6
|
G 1704 P1A/B Lubrication oil pump
|
2
|
See technical specification
|
Overseas delivery: CIF for 104 weeks, domestic port; Domestic delivery: DDP, 104 weeks to the use site for, Vehicle-delivery.
|
7
|
G 1704 F1A/B Lubrication oil filter
|
2
|
See technical specification
|
Overseas delivery: CIF for 104 weeks, domestic port; Domestic delivery: DDP, 104 weeks to the use site for, Vehicle-delivery.
|
8
|
G 1704 E1 Lubrication oil cooler
|
1
|
See technical specification
|
Overseas delivery: CIF for 104 weeks, domestic port; Domestic delivery: DDP, 104 weeks to the use site for, Vehicle-delivery.
|
9
|
G 1704 E2 Lubrication oil heater
|
1
|
See technical specification
|
Overseas delivery: CIF for 104 weeks, domestic port; Domestic delivery: DDP, 104 weeks to the use site for, Vehicle-delivery.
|
10
|
Noise protection cabin for Main extruder gearbox
|
1
|
See technical specification
|
Overseas delivery: CIF for 104 weeks, domestic port; Domestic delivery: DDP, 104 weeks to the use site for, Vehicle-delivery.
|
11
|
E 1702 Hot water cooler
|
1
|
See technical specification
|
Overseas delivery: CIF for 104 weeks, domestic port; Domestic delivery: DDP, 104 weeks to the use site for, Vehicle-delivery.
|
12
|
P 1705A/B Hot water circulation pump
|
2
|
See technical specification
|
Overseas delivery: CIF for 104 weeks, domestic port; Domestic delivery: DDP, 104 weeks to the use site for, Vehicle-delivery.
|
13
|
D 1720 Hot water buffer vessel
|
1
|
See technical specification
|
Overseas delivery: CIF for 104 weeks, domestic port; Domestic delivery: DDP, 104 weeks to the use site for, Vehicle-delivery.
|
14
|
Hot water manifold、(steam heating for start-up and cooling water injection into barrel jackets for cooling)
|
1
|
See technical specification
|
Overseas delivery: CIF for 104 weeks, domestic port; Domestic delivery: DDP, 104 weeks to the use site for, Vehicle-delivery.
|
15
|
Melt valve in feed line
|
1
|
See technical specification
|
Overseas delivery: CIF for 104 weeks, domestic port; Domestic delivery: DDP, 104 weeks to the use site for, Vehicle-delivery.
|
16
|
Hydraulic oil vessel
|
1
|
See technical specification
|
Overseas delivery: CIF for 104 weeks, domestic port; Domestic delivery: DDP, 104 weeks to the use site for, Vehicle-delivery.
|
17
|
Hydraulic oil pump A/B
|
2
|
See technical specification
|
Overseas delivery: CIF for 104 weeks, domestic port; Domestic delivery: DDP, 104 weeks to the use site for, Vehicle-delivery.
|
18
|
Hydraulic oil accumulator and valve、pipe
|
1
|
See technical specification
|
Overseas delivery: CIF for 104 weeks, domestic port; Domestic delivery: DDP, 104 weeks to the use site for, Vehicle-delivery.
|
19
|
EX 1702 Satellite Extruder
|
1
|
See technical specification
|
Overseas delivery: CIF for 104 weeks, domestic port; Domestic delivery: DDP, 104 weeks to the use site for, Vehicle-delivery.
|
20
|
EX 1702-M1 Satellite Extruder Motor
|
1
|
See technical specification
|
Overseas delivery: CIF for 104 weeks, domestic port; Domestic delivery: DDP, 104 weeks to the use site for, Vehicle-delivery.
|
21
|
variable speed (VSDS)
|
1
|
See technical specification
|
Overseas delivery: CIF for 104 weeks, domestic port; Domestic delivery: DDP, 104 weeks to the use site for, Vehicle-delivery.
|
22
|
(transformer for VSDS)and harmonic filter (1set) (if need)
|
1
|
See technical specification
|
Overseas delivery: CIF for 104 weeks, domestic port; Domestic delivery: DDP, 104 weeks to the use site for, Vehicle-delivery.
|
23
|
G1705 Satellite Extruder Gear Box with lubrication
|
1
|
See technical specification
|
Overseas delivery: CIF for 104 weeks, domestic port; Domestic delivery: DDP, 104 weeks to the use site for, Vehicle-delivery.
|
24
|
F 1710 Automatic Online Screen Pack Changer
|
1
|
See technical specification
|
Overseas delivery: CIF for 104 weeks, domestic port; Domestic delivery: DDP, 104 weeks to the use site for, Vehicle-delivery.
|
25
|
M 1703 Granulator
|
1
|
See technical specification
|
Overseas delivery: CIF for 104 weeks, domestic port; Domestic delivery: DDP, 104 weeks to the use site for, Vehicle-delivery.
|
26
|
M 1703-M1 Granulator Motor
|
1
|
See technical specification
|
Overseas delivery: CIF for 104 weeks, domestic port; Domestic delivery: DDP, 104 weeks to the use site for, Vehicle-delivery.
|
27
|
variable speed (VSDS)
|
1
|
See technical specification
|
Overseas delivery: CIF for 104 weeks, domestic port; Domestic delivery: DDP, 104 weeks to the use site for, Vehicle-delivery.
|
28
|
(transformer for VSDS)and harmonic filter (1set) (if need)
|
1
|
See technical specification
|
Overseas delivery: CIF for 104 weeks, domestic port; Domestic delivery: DDP, 104 weeks to the use site for, Vehicle-delivery.
|
29
|
die head
|
1
|
See technical specification
|
Overseas delivery: CIF for 104 weeks, domestic port; Domestic delivery: DDP, 104 weeks to the use site for, Vehicle-delivery.
|
30
|
die plate
|
1
|
See technical specification
|
Overseas delivery: CIF for 104 weeks, domestic port; Domestic delivery: DDP, 104 weeks to the use site for, Vehicle-delivery.
|
31
|
Connection pipes and valves between satellite extruder and extruder
|
1
|
See technical specification
|
Overseas delivery: CIF for 104 weeks, domestic port; Domestic delivery: DDP, 104 weeks to the use site for, Vehicle-delivery.
|
32
|
M 1704 Thermal Oil Unit (for Die plate heating) Automatic Online Screen Pack Changer
|
1
|
See technical specification
|
Overseas delivery: CIF for 104 weeks, domestic port; Domestic delivery: DDP, 104 weeks to the use site for, Vehicle-delivery.
|
33
|
HP-steam heating for Thermal Oil Unit
|
1
|
See technical specification
|
Overseas delivery: CIF for 104 weeks, domestic port; Domestic delivery: DDP, 104 weeks to the use site for, Vehicle-delivery.
|
34
|
BL 1901A/B Suction fan
|
2
|
See technical specification
|
Overseas delivery: CIF for 104 weeks, domestic port; Domestic delivery: DDP, 104 weeks to the use site for, Vehicle-delivery.
|
35
|
E 1902A/B Transport water cooler
|
2
|
See technical specification
|
Overseas delivery: CIF for 104 weeks, domestic port; Domestic delivery: DDP, 104 weeks to the use site for, Vehicle-delivery.
|
36
|
F 1901 Transport water fines sieve
|
1
|
See technical specification
|
Overseas delivery: CIF for 104 weeks, domestic port; Domestic delivery: DDP, 104 weeks to the use site for, Vehicle-delivery.
|
37
|
F 1902 Pellet Sieve (agglomerate catcher)
|
1
|
See technical specification
|
Overseas delivery: CIF for 104 weeks, domestic port; Domestic delivery: DDP, 104 weeks to the use site for, Vehicle-delivery.
|
38
|
F 1903A/B Transport water coarse sieve
|
1
|
See technical specification
|
Overseas delivery: CIF for 104 weeks, domestic port; Domestic delivery: DDP, 104 weeks to the use site for, Vehicle-delivery.
|
39
|
F 1904 Off-gas cyclone
|
1
|
See technical specification
|
Overseas delivery: CIF for 104 weeks, domestic port; Domestic delivery: DDP, 104 weeks to the use site for, Vehicle-delivery.
|
40
|
M 1902 Sampling device
|
1
|
See technical specification
|
Overseas delivery: CIF for 104 weeks, domestic port; Domestic delivery: DDP, 104 weeks to the use site for, Vehicle-delivery.
|
41
|
M 1903 Diverter valve
|
1
|
See technical specification
|
Overseas delivery: CIF for 104 weeks, domestic port; Domestic delivery: DDP, 104 weeks to the use site for, Vehicle-delivery.
|
42
|
P 1901A/B Transport water pump
|
2
|
See technical specification
|
Overseas delivery: CIF for 104 weeks, domestic port; Domestic delivery: DDP, 104 weeks to the use site for, Vehicle-delivery.
|
43
|
P 1902 Water jet pump
|
1
|
See technical specification
|
Overseas delivery: CIF for 104 weeks, domestic port; Domestic delivery: DDP, 104 weeks to the use site for, Vehicle-delivery.
|
44
|
R 1901 Pellet Dryer
|
1
|
See technical specification
|
Overseas delivery: CIF for 104 weeks, domestic port; Domestic delivery: DDP, 104 weeks to the use site for, Vehicle-delivery.
|
45
|
D 1902 Transport water tank
|
1
|
See technical specification
|
Overseas delivery: CIF for 104 weeks, domestic port; Domestic delivery: DDP, 104 weeks to the use site for, Vehicle-delivery.
|
46
|
F 1905 Vibrating screen
|
1
|
See technical specification
|
Overseas delivery: CIF for 104 weeks, domestic port; Domestic delivery: DDP, 104 weeks to the use site for, Vehicle-delivery.
|
47
|
E 1904 Air preheater
|
1
|
See technical specification
|
Overseas delivery: CIF for 104 weeks, domestic port; Domestic delivery: DDP, 104 weeks to the use site for, Vehicle-delivery.
|
48
|
BL 1904 Exhaust fan (if necessary)
|
1
|
See technical specification
|
Overseas delivery: CIF for 104 weeks, domestic port; Domestic delivery: DDP, 104 weeks to the use site for, Vehicle-delivery.
|
49
|
M 1904 Diverter valve (upstream screen)
|
1
|
See technical specification
|
Overseas delivery: CIF for 104 weeks, domestic port; Domestic delivery: DDP, 104 weeks to the use site for, Vehicle-delivery.
|
50
|
D 1910 pH control agent tank
|
1
|
See technical specification
|
Overseas delivery: CIF for 104 weeks, domestic port; Domestic delivery: DDP, 104 weeks to the use site for, Vehicle-delivery.
|
51
|
D 1920 Anti-sticking agent tank
|
1
|
See technical specification
|
Overseas delivery: CIF for 104 weeks, domestic port; Domestic delivery: DDP, 104 weeks to the use site for, Vehicle-delivery.
|
52
|
P 1910 pH buffering dosing pump
|
1
|
See technical specification
|
Overseas delivery: CIF for 104 weeks, domestic port; Domestic delivery: DDP, 104 weeks to the use site for, Vehicle-delivery.
|
53
|
P 1920 Anti-sticking agent pump
|
1
|
See technical specification
|
Overseas delivery: CIF for 104 weeks, domestic port; Domestic delivery: DDP, 104 weeks to the use site for, Vehicle-delivery.
|
54
|
Piping system for pellet water and pellet handling system
|
1
|
See technical specification
|
Overseas delivery: CIF for 104 weeks, domestic port; Domestic delivery: DDP, 104 weeks to the use site for, Vehicle-delivery.
|
55
|
Instrumentation for pellet handling system
|
1
|
See technical specification
|
Overseas delivery: CIF for 104 weeks, domestic port; Domestic delivery: DDP, 104 weeks to the use site for, Vehicle-delivery.
|
56
|
Control system (PLC)
|
1
|
See technical specification
|
Overseas delivery: CIF for 104 weeks, domestic port; Domestic delivery: DDP, 104 weeks to the use site for, Vehicle-delivery.
|
57
|
Local panel
|
1
|
See technical specification
|
Overseas delivery: CIF for 104 weeks, domestic port; Domestic delivery: DDP, 104 weeks to the use site for, Vehicle-delivery.
|
58
|
Machine Monitoring System (MMS)
|
1
|
See technical specification
|
Overseas delivery: CIF for 104 weeks, domestic port; Domestic delivery: DDP, 104 weeks to the use site for, Vehicle-delivery.
|
59
|
MFR measurement device (optional)
|
1
|
See technical specification
|
Overseas delivery: CIF for 104 weeks, domestic port; Domestic delivery: DDP, 104 weeks to the use site for, Vehicle-delivery.
|
60
|
grease, first fillings
|
1 set
|
See technical specification
|
Overseas delivery: CIF for 104 weeks, domestic port; Domestic delivery: DDP, 104 weeks to the use site for, Vehicle-delivery.
|
61
|
Pipeline valve steel structure support stent in the system
|
1
|
See technical specification
|
Overseas delivery: CIF for 104 weeks, domestic port; Domestic delivery: DDP, 104 weeks to the use site for, Vehicle-delivery.
|
62
|
Instrument Control System Instrument control panels/operator consoles, instrument control valves, vibration switches, and other instrument control and status monitoring, interlock control system equipment for equipment systems.
|
1
|
See technical specification
|
Overseas delivery: CIF for 104 weeks, domestic port; Domestic delivery: DDP, 104 weeks to the use site for, Vehicle-delivery.
|
63
|
Electrical Control System Electrical equipment such as oil pump motor, junction box, and emergency stop button for equipment system
|
1
|
See technical specification
|
Overseas delivery: CIF for 104 weeks, domestic port; Domestic delivery: DDP, 104 weeks to the use site for, Vehicle-delivery.
|
64
|
Equipment support and anchor bolts for installation
|
1 set
|
See technical specification
|
Overseas delivery: CIF for 104 weeks, domestic port; Domestic delivery: DDP, 104 weeks to the use site for, Vehicle-delivery.
|
65
|
Vibrating Screen After-Discharge Weighing System (Mass Flow Meter, Straight-Through Type)
|
1
|
See technical specification
|
Overseas delivery: CIF for 104 weeks, domestic port; Domestic delivery: DDP, 104 weeks to the use site for, Vehicle-delivery.
|
66
|
Start-up valve(optional)
|
1
|
See technical specification
|
Overseas delivery: CIF for 104 weeks, domestic port; Domestic delivery: DDP, 104 weeks to the use site for, Vehicle-delivery.
|
67
|
The barrel specially insulated
|
1
|
See technical specification
|
Overseas delivery: CIF for 104 weeks, domestic port; Domestic delivery: DDP, 104 weeks to the use site for, Vehicle-delivery.
|
68
|
Installation with special bolts and nuts
|
1 set
|
See technical specification
|
Overseas delivery: CIF for 104 weeks, domestic port; Domestic delivery: DDP, 104 weeks to the use site for, Vehicle-delivery.
|
3、Qualification Requirements For BidderQualifications or Performance:1) Domestic enterprises with independent legal representative qualification, which could provide valid business license; and overseas enterprises, which are required to provide relevant supporting documents for registration at the address of main manufacturing plant according to the laws of the country (region). 2)Bidders are required to provide the supply performance of a set of Extruder and Pelleting System for LDPE or LDPE/EVA units of 250,000 tons/year or above from 2018 to the deadline for bidding (subject to the time of contract signing), and a valid contract scan copy (the contract contains at least the Home, technical part and signature page of the contract). If the contract cannot reflect the above contents, other relevant valid supporting materials must be provided, and the original documents shall be available for reference. 3) The bidder must be a Extruder and Pelleting System Package Unit manufacturer, and the agent bidding is not accepted.Joint Bids:NOT AvailableBid without the bidding documents:NOT Available4、Acquisition of Bidding DocumentsBeginning of Selling Bidding Documents:2025-01-03Ending of Selling Bidding Documents:2025-01-17Sell bidding doc online or not:NoTo Obtain::On-site PurchasePlace:www.zmzb.comPrice of Bidding Documents:¥200/$27.375、Bid SubmissionDeadline for Submitting Bids/Time of Bid Opening (Beijing Time):2025-01-24 09:30Place of Bid:Meeting Room 105, Meiji Building, No. 192, Andingmenwai Street, Dongcheng District, BeijingPlace of Bid Opening:Meeting Room 105, Meiji Building, No. 192, Andingmenwai Street, Dongcheng District, Beijing6、Contact DetailsPurchasers:China Coal Shaanxi Energy & Chemical Group Co.,Ltd.Add.:East of B1 Road, North of Yuma Avenue, High-tech Industrial Park, Yulin City, Shaanxi ProvinceContact:Liu JiaTel:0912-7100210Bidding Agency:China Coal Tendering Co., Ltd.Add.:Zhongmei Building, No. 88 B Andingmenwai Street, Dongcheng District, BeijingContact:Wang ZhuoxinTel:155103781627、Remittance Approach:Bank(RMB):Bank(USD):Account NO.(RMB):Account NO.(USD):